Trusted Test Experts
Services
Repair of CSC3 Converters – Power stacks and Controllers (HU, SU, CMW)
Power converters WILL fail in field. Anecto’s services will ease that burden.
Anecto offer a comprehensive repair process for power electronics components in renewable energy.
This includes heavy duty power components (SKiiP racs, etc.) from Woodward CSC3 and CSC4 power converters and both SU (Spannung Umrichter) and HU (Haupt Umrichter) controllers from CSC3 converters.
![]() |
![]() |
What Anecto brings:
- Sustaining engineering support for CSC3
- Unmatched third party testing
- Laboratory recreation of in-field conditions
- Comprehensive repair
- Experienced & knowledgeable staff
What it means for you:
- Extends life of CSC3 converters
- Reduced downtime
- Increased productivity
- Money saved
- Peace of mind
![]() |
![]() |
When your part arrives in Anecto we connect the unit as if it was in a real system and power it up to begin the test and identify any issues.
We have the required test stations with all the connections that would be found in a real system out in the field.
Common issues we deal with include:
- Alarm signal causes
- Communication errors
- Trigger file errors
- Analogue processing
- Power supply problems
Anecto offers the highest level of third party testing.